ONSHORE WIND Β· WEST

Onshore wind project 42, Lewis County

Onshore wind project 42, Lewis County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Lewis County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
42
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Tono Substation
Location
Lewis County, Washington
Technology
Wind: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
14 May 2015
Proposed online date
December 2017

Location

Marker shows the centre of Lewis County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Lewis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem