OTHER · WESTOther project G1072, Lewis County
Other project G1072, Lewis County is a 667 MW other request in interconnection study in the West interconnection queue, in Lewis County, Washington.
- PlanningQueued Dec 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- G1072
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- CW Paul 500kV Substation
- Location
- Lewis County, Washington
- Technology
- Solar: 183 MW · Wind: 174 MW · Battery: 310 MW
- Total requested
- 667 MW
- Service type
- Energy only (ERIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 30 December 2024
- Proposed online date
- September 2027
Location
Marker shows the centre of Lewis County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Lewis County
- Wind + storage project G1007, Lewis CountyWind + storage · 600 MW · in study
- Gas project 113, Lewis CountyGas · 219 MW · suspended
- Centralia Generation AdditionGas · 248 MW · built
- Onshore wind project 46, Lewis CountyOnshore wind · 137 MW · built
- Centralia GenerationGas · 50.0 MW · built
- 1100MW PaulGas · 1,100 MW · withdrawn
- Onshore wind project G0595, Lewis CountyOnshore wind · 307 MW · withdrawn
- Battery storage project 106, Lewis CountyBattery storage · 200 MW · withdrawn
- Onshore wind project G0718, Lewis CountyOnshore wind · 170 MW · withdrawn
- Onshore wind project G0769, Lewis CountyOnshore wind · 170 MW · withdrawn
- Battery storage project 125, Lewis CountyBattery storage · 170 MW · withdrawn
- Onshore wind project G0515, Lewis CountyOnshore wind · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem