πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

BATTERY STORAGE Β· WEST

Battery storage project 106, Lewis County

Battery storage project 106, Lewis County is a 200 MW battery storage request withdrawn in the West interconnection queue, in Lewis County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
106
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Tono 115-kV Substation
Location
Lewis County, Washington
Technology
Battery: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
20 April 2021
Proposed online date
June 2023

Location

Marker shows the centre of Lewis County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Lewis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem