WIND + STORAGE · WESTWind + storage project G1007, Lewis County
Wind + storage project G1007, Lewis County is a 600 MW wind + storage request in interconnection study in the West interconnection queue, in Lewis County, Washington.
- PlanningQueued Nov 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- G1007
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Paul Substation
- Location
- Lewis County, Washington
- Technology
- Wind: 300 MW · Battery: 300 MW
- Total requested
- 600 MW
- Service type
- NRIS and ERIS
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 17 November 2023
- Proposed online date
- October 2030
Location
Marker shows the centre of Lewis County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Lewis County
- Other project G1072, Lewis CountyOther · 667 MW · in study
- Gas project 113, Lewis CountyGas · 219 MW · suspended
- Centralia Generation AdditionGas · 248 MW · built
- Onshore wind project 46, Lewis CountyOnshore wind · 137 MW · built
- Centralia GenerationGas · 50.0 MW · built
- 1100MW PaulGas · 1,100 MW · withdrawn
- Onshore wind project G0595, Lewis CountyOnshore wind · 307 MW · withdrawn
- Battery storage project 106, Lewis CountyBattery storage · 200 MW · withdrawn
- Onshore wind project G0718, Lewis CountyOnshore wind · 170 MW · withdrawn
- Onshore wind project G0769, Lewis CountyOnshore wind · 170 MW · withdrawn
- Battery storage project 125, Lewis CountyBattery storage · 170 MW · withdrawn
- Onshore wind project G0515, Lewis CountyOnshore wind · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem