United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

GAS Β· WEST

1100MW Paul

1100MW Paul is a 1,100 MW gas request withdrawn in the West interconnection queue, in Lewis County, Washington, connecting to Cogentrix Energy, Inc..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G9
Grid region
West (non-ISO utilities)
Utility / transmission owner
Cogentrix Energy, Inc.
Developer
Cogentrix Energy, Inc.
Connection point (POI)
Paul 500 kV Substation
Location
Lewis County, Washington
Technology
Gas: 1,100 MW
Total requested
1,100 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
28 August 2000
Proposed online date
July 2004

Location

Marker shows the centre of Lewis County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Lewis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem