United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

ONSHORE WIND Β· WEST

Onshore wind project G0326, Box Elder County

Onshore wind project G0326, Box Elder County is a 42.0 MW onshore wind request withdrawn in the West interconnection queue, in Box Elder County, Utah.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0326
Grid region
West (non-ISO utilities)
Connection point (POI)
At BPA's 138 kV Bridge Substation
Location
Box Elder County, Utah
Technology
Wind: 42.0 MW
Total requested
42.0 MW
Service type
Network resource (NRIS)
Study phase
Facility Study
Queue status
Withdrawn
Entered queue
5 May 2008
Proposed online date
June 2010

Location

Marker shows the centre of Box Elder County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Box Elder County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem