πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· MISO

Onshore wind project G803, Deuel County

Onshore wind project G803, Deuel County is a 150 MW onshore wind request withdrawn in the MISO interconnection queue, in Deuel County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2007 (completed)
  2. Withdrawn / abandonedMay 2011 (project stopped here)
  3. ConsentedMay 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G803
Grid region
MISO (Midcontinent)
Connection point (POI)
Toronto 115 kV
Location
Deuel County, South Dakota
Technology
Wind: 150 MW
Total requested
150 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
30 May 2007
Agreement signed
4 May 2011
Proposed online date
December 2009
Withdrawn
May 2011

Location

Marker shows the centre of Deuel County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Deuel County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem