United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project J747, Deuel County
Onshore wind project J747, Deuel County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Deuel County, South Dakota, connecting to OTTER TAIL POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedApr 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J747
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- OTTER TAIL POWER COMPANY
- Connection point (POI)
- Brooking County - Big Stone South (J510 Tap - J630 Tap) 345kV Line
- Location
- Deuel County, South Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 November 2016
- Proposed online date
- October 2017
- Withdrawn
- April 2019
Location
Marker shows the centre of Deuel County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Deuel County
- Gas project J3941, Deuel CountyGas Β· 1,144 MW Β· in study
- Onshore wind project J1485, Deuel CountyOnshore wind Β· 250 MW Β· in study
- Other project J3400, Deuel CountyOther Β· 142 MW Β· in study
- Onshore wind project J526, Deuel CountyOnshore wind Β· 300 MW Β· built
- Gas project J510, Deuel CountyGas Β· 285 MW Β· built
- Onshore wind project J442, Deuel CountyOnshore wind Β· 200 MW Β· built
- Other project GI-0516, Deuel CountyOther Β· 1.0 MW Β· built
- Gas project J4032, Deuel CountyGas Β· 442 MW Β· withdrawn
- Onshore wind project J597, Deuel CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project G804, Deuel CountyOnshore wind Β· 250 MW Β· withdrawn
- Solar project J3862, Deuel CountySolar Β· 250 MW Β· withdrawn
- Onshore wind project J638, Deuel CountyOnshore wind Β· 204 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem