Onshore wind project AC1-176, Paulding County

Onshore wind project AC1-176, Paulding County is a 58.7 MW onshore wind request withdrawn in the PJM interconnection queue, in Paulding County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2016 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AC1-176
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Timber Switch 138kV
Location
Paulding County, Ohio
Technology
Wind: 58.7 MW
Total requested
58.7 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
31 October 2016
Proposed online date
October 2019
Withdrawn
July 2020

Location

Marker shows the centre of Paulding County; the queue data does not give exact sites.