πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Wisconsin (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown192,348 MW
Active in queue2,521 MW16 requests
Agreement signed1,921 MW13 requests
Withdrawn192,348 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

19 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J1838, Dane County
Gas
320 MWWithdrawn / abandoned Dane, WIMISO Jun 2020target 2025
Solar project J1753, Green County
Solar
300 MWWithdrawn / abandoned Green, WIMISO Jun 2020target 2024
Solar project J1705, Columbia County
Solar
200 MWWithdrawn / abandoned Columbia, WIMISO Jun 2020target 2024
Onshore wind project J1631, Clark County
Onshore wind
200 MWWithdrawn / abandoned Clark, WIMISO Jun 2020target 2023
Solar project J1775, Calumet County
Solar
150 MWWithdrawn / abandoned Calumet, WIMISO Jun 2020target 2023
Solar project J1497, Jefferson County
Solar
125 MWWithdrawn / abandoned Jefferson, WIMISO Jun 2020target 2024
Solar project J1740, Walworth County
Solar
100 MWWithdrawn / abandoned Walworth, WIMISO Jun 2020target 2023
Solar project J1510, Wood County
Solar
100 MWWithdrawn / abandoned Wood, WIMISO Jun 2020target 2023
Solar project J1711, Green County
Solar
100 MWWithdrawn / abandoned Green, WIMISO Jun 2020target 2023
Solar project J1716, Fond Du Lac County
Solar
100 MWWithdrawn / abandoned Fond Du Lac, WIMISO Jun 2020target 2025
Solar project J1596, Waushara County
Solar
100 MWWithdrawn / abandoned Waushara, WIMISO Jun 2020target 2023
Solar project J1719, Waushara County
Solar
100 MWWithdrawn / abandoned Waushara, WIMISO Jun 2020target 2023
Solar project J1720, Columbia County
Solar
99.0 MWWithdrawn / abandoned Columbia, WIMISO Jun 2020target 2024
Onshore wind project J1512, Lafayette County
Onshore wind
98.9 MWWithdrawn / abandoned Lafayette, WIMISO Jun 2020target 2023
Solar project J1735, Rock County
Solar
75.0 MWWithdrawn / abandoned Rock, WIMISO Jun 2020target 2025
Solar project J1708, Grant County
Solar
75.0 MWWithdrawn / abandoned Grant, WIMISO Jun 2020target 2025
Battery storage project J1739, Waushara County
Battery storage
50.0 MWWithdrawn / abandoned Waushara, WIMISO Jun 2020target 2023
Solar project J1569, Pierce County
Solar
44.0 MWWithdrawn / abandoned Pierce, WIMISO Jun 2020target 2023
Replace 11.4 of WPS.LAKEFRN96 Unit with natural gas (with diesel as a backup); Lakefront 9
Gas
11.4 MWWithdrawn / abandoned Manitowoc, WIMISO Jul 2020target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)