United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
SOLAR Β· MISOSolar project J1708, Grant County
Solar project J1708, Grant County is a 75.0 MW solar request withdrawn in the MISO interconnection queue, in Grant County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedJun 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1708
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMERICAN TRANSMISSION COMPANY
- Connection point (POI)
- J947 Interconnection Substation
- Location
- Grant County, Wisconsin
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 23 June 2020
- Proposed online date
- June 2025
- Withdrawn
- June 2023
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Grant County
- Onshore wind project J855, Grant CountyOnshore wind Β· 100 MW Β· under construction
- Solar project J871, Grant CountySolar Β· 100 MW Β· under construction
- Onshore wind project J1374, Grant CountyOnshore wind Β· 95.0 MW Β· agreement signed
- Onshore wind project J3448, Grant CountyOnshore wind Β· 180 MW Β· in study
- Surplus; J1000Other Β· 25.0 MW Β· in study
- Solar project J947, Grant CountySolar Β· 200 MW Β· built
- Solar project J870, Grant CountySolar Β· 200 MW Β· built
- Solar project J1000, Grant CountySolar Β· 50.0 MW Β· built
- Coal project G527, Grant CountyCoal Β· 280 MW Β· withdrawn
- Other project G139, Grant CountyOther Β· 250 MW Β· withdrawn
- Other project G087, Grant CountyOther Β· 200 MW Β· withdrawn
- Onshore wind project J139, Grant CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem