United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
SOLAR Β· MISOSolar project J1569, Pierce County
Solar project J1569, Pierce County is a 44.0 MW solar request withdrawn in the MISO interconnection queue, in Pierce County, Wisconsin, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedJan 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1569
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Red Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert)
- Location
- Pierce County, Wisconsin
- Technology
- Solar: 44.0 MW
- Total requested
- 44.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 22 June 2020
- Proposed online date
- August 2023
- Withdrawn
- January 2021
Location
Marker shows the centre of Pierce County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Pierce County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem