SOLAR Β· MISO

Solar project J801, Pierce County

Solar project J801, Pierce County is a 74.0 MW solar request withdrawn in the MISO interconnection queue, in Pierce County, Wisconsin, connecting to DAIRYLAND POWER COOPERATIVE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedJul 2024 (project stopped here)
  3. ConsentedMay 2021 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J801
Grid region
MISO (Midcontinent)
Utility / transmission owner
DAIRYLAND POWER COOPERATIVE
Connection point (POI)
Crystal Cave-Rock Elm 161kV line tap
Location
Pierce County, Wisconsin
Technology
Solar: 74.0 MW
Total requested
74.0 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: GIA; Post GIA Status: Withdrawn
Queue status
Withdrawn
Entered queue
16 June 2017
Agreement signed
19 May 2021
Proposed online date
November 2023
Withdrawn
July 2024

Location

Marker shows the centre of Pierce County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Pierce County