United States βΊ Grid βΊ Interconnection queues βΊ Ohio
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Ohio (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project X3-051 Gas |
610 MW | Withdrawn / abandoned |
| Emerson Creek Wind Farm Onshore wind |
500 MW | Withdrawn / abandoned |
| Onshore wind project J208, Huron County Onshore wind |
500 MW | Withdrawn / abandoned |
| Gas project X1-064A_AT13, Summit County Gas |
268 MW | Withdrawn / abandoned |
| Gas project J211, Summit County Gas |
268 MW | Withdrawn / abandoned |
| Onshore wind project X3-030, Marion County Onshore wind |
245 MW | Withdrawn / abandoned |
| Coal project X1-027, Scioto County Coal |
200 MW | Withdrawn / abandoned |
| Onshore wind project X3-031, Allen County Onshore wind |
150 MW | Withdrawn / abandoned |
| Onshore wind project X2-058, Hancock County Onshore wind |
150 MW | Withdrawn / abandoned |
| Onshore wind project X2-039, Ashland County Onshore wind |
100 MW | Withdrawn / abandoned |
| 6011 Greenwich Windpark, LLC Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Gas project X4-003, Washington County Gas |
56.0 MW | Withdrawn / abandoned |
| Solar project X1-009, Allen County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project J210, Butler County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project X1-058A_DK2, Butler County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project X3-059, Marion County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project X3-053, Medina County Solar |
17.7 MW | Withdrawn / abandoned |
| Barberton Solar Solar |
14.0 MW | Withdrawn / abandoned |
| Solar project X4-030, Sandusky County Solar |
13.8 MW | Withdrawn / abandoned |
| Solar project X1-033, Wyandot County Solar |
12.0 MW | Withdrawn / abandoned |
| Solar project X2-077, Darke County Solar |
10.0 MW | Withdrawn / abandoned |
| Other project X2-053, Jefferson County Other |
6.4 MW | Withdrawn / abandoned |
| Solar project X2-051 Solar |
6.0 MW | Withdrawn / abandoned |
| Greenville Solar Solar |
3.4 MW | Withdrawn / abandoned |
| Edgewood Solar |
1.8 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)