United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· PJMOnshore wind project X2-039, Ashland County
Onshore wind project X2-039, Ashland County is a 100 MW onshore wind request withdrawn in the PJM interconnection queue, in Ashland County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2011 (completed)
- Withdrawn / abandonedDec 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X2-039
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Brookside-Cloverdale 138kV
- Location
- Ashland County, Ohio
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 15 June 2011
- Proposed online date
- December 2013
- Withdrawn
- December 2011
Location
Marker shows the centre of Ashland County; the queue data does not give exact sites.
Other requests in Ashland County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem