United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· MISOSolar project J210, Butler County
Solar project J210, Butler County is a 20.0 MW solar request withdrawn in the MISO interconnection queue, in Butler County, Ohio.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2011 (completed)
- Withdrawn / abandonedFeb 2012 (project stopped here)
- ConsentedFeb 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J210
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Todd Hunter 69 kV Substation
- Location
- Butler County, Ohio
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 5 April 2011
- Agreement signed
- 22 February 2012
- Proposed online date
- October 2013
- Withdrawn
- February 2012
Location
Marker shows the centre of Butler County; the queue data does not give exact sites.
Other requests in Butler County
- Woodsdale Renewable Energy CenterSolar Β· 49.0 MW Β· agreement signed
- Solar project AI1-092, Butler CountySolar Β· 49.9 MW Β· in study
- Solar + storage project AI1-150, Butler CountySolar + storage Β· 49.9 MW Β· in study
- Middletown Energy CenterGas Β· 513 MW Β· built
- Meldahl Hydroelectric PlantHydro Β· 112 MW Β· built
- Other project G941, Butler CountyOther Β· 67.0 MW Β· built
- Coal project G837, Butler CountyCoal Β· 25.0 MW Β· built
- Other project G098, Butler CountyOther Β· 165 MW Β· withdrawn
- Gas project W1-058A_DK1, Butler CountyGas Β· 135 MW Β· withdrawn
- Gas project J120, Butler CountyGas Β· 135 MW Β· withdrawn
- Solar project AD2-146, Butler CountySolar Β· 100 MW Β· withdrawn
- Solar project AD2-147, Butler CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem