Gas project W1-058A_DK1, Butler County

Gas project W1-058A_DK1, Butler County is a 135 MW gas request withdrawn in the PJM interconnection queue, in Butler County, Ohio, connecting to Duke.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2010 (completed)
  2. Withdrawn / abandonedJul 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
W1-058A_DK1
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Duke
Connection point (POI)
AK Steel Middletown-AK Steel 1C 138kV
Location
Butler County, Ohio
Technology
Gas: 135 MW
Total requested
135 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
23 March 2010
Proposed online date
September 2012
Withdrawn
July 2012

Location

Marker shows the centre of Butler County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Butler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem