GAS Β· MISOGas project J120, Butler County
Gas project J120, Butler County is a 135 MW gas request withdrawn in the MISO interconnection queue, in Butler County, Ohio.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2010 (completed)
- Withdrawn / abandonedDec 2011 (project stopped here)
- ConsentedDec 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J120
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- AK Steel Middletown - AK Steel 1C Substation 138kV
- Location
- Butler County, Ohio
- Technology
- Gas: 135 MW
- Total requested
- 135 MW
- Study phase
- Network Upgrade
- Queue status
- Withdrawn
- Entered queue
- 23 March 2010
- Agreement signed
- 31 December 2011
- Proposed online date
- July 2010
- Withdrawn
- December 2011
Location
Marker shows the centre of Butler County; the queue data does not give exact sites.
Other requests in Butler County
- Woodsdale Renewable Energy CenterSolar Β· 49.0 MW Β· agreement signed
- Solar project AI1-092, Butler CountySolar Β· 49.9 MW Β· in study
- Solar + storage project AI1-150, Butler CountySolar + storage Β· 49.9 MW Β· in study
- Middletown Energy CenterGas Β· 513 MW Β· built
- Meldahl Hydroelectric PlantHydro Β· 112 MW Β· built
- Other project G941, Butler CountyOther Β· 67.0 MW Β· built
- Coal project G837, Butler CountyCoal Β· 25.0 MW Β· built
- Other project G098, Butler CountyOther Β· 165 MW Β· withdrawn
- Gas project W1-058A_DK1, Butler CountyGas Β· 135 MW Β· withdrawn
- Solar project AD2-146, Butler CountySolar Β· 100 MW Β· withdrawn
- Solar project AD2-147, Butler CountySolar Β· 100 MW Β· withdrawn
- Battery storage project AG2-664, Butler CountyBattery storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem