Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
800 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
800 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
700 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
500 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
204 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Eversource Group Study @ Wareham Solar + storage |
55.1 MW | Withdrawn / abandoned |
| Eversource Group @ Wareham 714 Solar + storage |
48.0 MW | Withdrawn / abandoned |
| Eversource Group @ West Pond 737 Solar + storage |
44.1 MW | Withdrawn / abandoned |
| Solar Solar |
40.0 MW | Withdrawn / abandoned |
| Eversource Group @ Tremont Substation 713 Solar + storage |
33.7 MW | Withdrawn / abandoned |
| Eversource Group @ Industrial Park 636 Solar + storage |
29.1 MW | Withdrawn / abandoned |
| Eversource Group @ Fisher Rd Substation 657 Solar + storage |
27.9 MW | Withdrawn / abandoned |
| Eversource Group @ Rochester #745 Solar + storage |
24.6 MW | Withdrawn / abandoned |
| Eversource Group Study @ Crystal Spring Solar + storage |
20.5 MW | Withdrawn / abandoned |
| Eversource Group @ Wing Lane 624 Solar + storage |
19.0 MW | Withdrawn / abandoned |
| Eversource Group Study @ Blandford Solar |
12.5 MW | Withdrawn / abandoned |
| Eversource Group @ Bell Rock #661 Solar + storage |
12.0 MW | Withdrawn / abandoned |
| Eversource Group @ Sandwich 916 Solar + storage |
11.8 MW | Withdrawn / abandoned |
| Eversource Group Study @ Industrial Park Solar + storage |
11.3 MW | Withdrawn / abandoned |
| Eversource Group @ Valley 715 Solar + storage |
10.0 MW | Withdrawn / abandoned |
| Eversource Group Study @ Brook St Solar + storage |
9.8 MW | Withdrawn / abandoned |
| Eversource Group @ Cross Rd 651 Solar + storage |
9.5 MW | Withdrawn / abandoned |
| Eversource Group @ Falmouth 993 Solar + storage |
8.0 MW | Withdrawn / abandoned |
| Eversource Group @ Crystal Spring 646 Solar + storage |
7.5 MW | Withdrawn / abandoned |
| Eversource Group @ Arsene St 654 Solar + storage |
7.0 MW | Withdrawn / abandoned |
| Solar + battery Solar + storage |
5.5 MW | Withdrawn / abandoned |
| Eversource Group Study @ Wing Lane Solar |
5.1 MW | Withdrawn / abandoned |
| Solar + Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
4.9 MW | Withdrawn / abandoned |
| Solar + battery Solar + storage |
3.2 MW | Withdrawn / abandoned |
| Solar Solar |
2.8 MW | Withdrawn / abandoned |
| Solar Solar |
2.5 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
2.4 MW | Withdrawn / abandoned |
| Solar + Battery Solar + storage |
2.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
2.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)