Requests shown142,233 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn142,233 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

14 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Wind
Onshore wind
601 MWWithdrawn / abandoned Aroostook, MEISO-NE Jun 2014target 2018
Wind
Onshore wind
601 MWWithdrawn / abandoned Aroostook, MEISO-NE Jun 2014target 2019
Wind
Onshore wind
250 MWWithdrawn / abandoned Hancock, MEISO-NE Dec 2014target 2021
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2014target 2018
wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2014target 2020
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2014target 2020
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2014target 2020
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2014target 2020
Wind
Onshore wind
104 MWWithdrawn / abandoned Washington, MEISO-NE Jan 2014target 2018
Wind
Onshore wind
85.0 MWWithdrawn / abandoned Somerset, MEISO-NE Mar 2014target 2018
Wind
Onshore wind
52.8 MWWithdrawn / abandoned Penobscot, MEISO-NE Aug 2014target 2017
Offshore Wind
Offshore wind
10.0 MWWithdrawn / abandoned Lincoln, MEISO-NE Mar 2014target 2017
Wind
Onshore wind
9.6 MWWithdrawn / abandoned Washington, MEISO-NE Oct 2014target 2016
Wind Increase (see Q452)
Onshore wind
0.8 MWWithdrawn / abandoned Somerset, MEISO-NE Apr 2014target 2018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)