United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Georgia (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown183,612 MW
Active in queue7,061 MW35 requests
Agreement signed3,192 MW14 requests
Withdrawn305,643 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

18 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project IC-1147, Monroe County
Solar
500 MWPaused / redesign Monroe, GASoutheast Jun 2023target 2030
Battery storage project IC-1170, Douglas County
Battery storage
500 MWPaused / redesign Douglas, GASoutheast Aug 2023target 2030
Battery storage project IC-1144, Bartow County
Battery storage
260 MWPaused / redesign Bartow, GASoutheast Jun 2023target 2028
Solar project IC-1149, Mitchell County
Solar
250 MWPaused / redesign Mitchell, GASoutheast Jul 2023target 2028
Hammond Solar
Solar
225 MWIn study Floyd, GASoutheast Sep 2023target 2025
Pecan Energy Storage
Solar + storage
208 MWIn study Mitchell, GASoutheast Oct 2023target 2029
Live Oak Solar
Solar + storage
200 MWIn study Laurens, GASoutheast May 2023target 2026
Pepper Hammock 200 MW
Solar
200 MWIn study Glynn, GASoutheast Aug 2023target 2026
Beaver Creek Solar
Solar + storage
183 MWIn study Baldwin, GASoutheast Sep 2023target 2027
Red Dirt Solar
Solar + storage
153 MWIn study Talbot, GASoutheast Apr 2023target 2026
Solar project IC-1165, Elbert County
Solar
150 MWPaused / redesign Elbert, GASoutheast Aug 2023target 2027
Solar project IC-1153, Wilcox County
Solar
150 MWPaused / redesign Wilcox, GASoutheast Jul 2023target 2027
TOCE GA 1 Solar
Solar
125 MWIn study Burke, GASoutheast Aug 2023target 2026
Pelham Solar
Solar
120 MWIn study Charlton, GASoutheast Sep 2023target 2025
SR Bacon II Solar
Solar
115 MWIn study Bacon, GASoutheast Sep 2023target 2027
Solar project IC-1136, Lincoln County
Solar
105 MWPaused / redesign Lincoln, GASoutheast Apr 2023target 2027
SR Bacon III Solar
Solar
100 MWIn study Bacon, GASoutheast Sep 2023target 2028
Solar project IC-1176, Glascock County
Solar
68.5 MWPaused / redesign Glascock, GASoutheast Sep 2023target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)