United States βΊ Grid βΊ Interconnection queues βΊ Georgia
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in Georgia (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project IC-1147, Monroe County Solar |
500 MW | Paused / redesign |
| Battery storage project IC-1170, Douglas County Battery storage |
500 MW | Paused / redesign |
| Battery storage project IC-1144, Bartow County Battery storage |
260 MW | Paused / redesign |
| Solar project IC-1149, Mitchell County Solar |
250 MW | Paused / redesign |
| Hammond Solar Solar |
225 MW | In study |
| Pecan Energy Storage Solar + storage |
208 MW | In study |
| Live Oak Solar Solar + storage |
200 MW | In study |
| Pepper Hammock 200 MW Solar |
200 MW | In study |
| Beaver Creek Solar Solar + storage |
183 MW | In study |
| Red Dirt Solar Solar + storage |
153 MW | In study |
| Solar project IC-1165, Elbert County Solar |
150 MW | Paused / redesign |
| Solar project IC-1153, Wilcox County Solar |
150 MW | Paused / redesign |
| TOCE GA 1 Solar Solar |
125 MW | In study |
| Pelham Solar Solar |
120 MW | In study |
| SR Bacon II Solar Solar |
115 MW | In study |
| Solar project IC-1136, Lincoln County Solar |
105 MW | Paused / redesign |
| SR Bacon III Solar Solar |
100 MW | In study |
| Solar project IC-1176, Glascock County Solar |
68.5 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)