United States › Grid › Interconnection queues › Georgia
SOLAR · SOUTHEASTSR Bacon III Solar
SR Bacon III Solar is a 100 MW solar request in interconnection study in the Southeast interconnection queue, in Bacon County, Georgia, connecting to Georgia Transmission.
Queue statusIn planning
- PlanningQueued Sep 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GI-186
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Offerman - Douglas 230 kV TL
- Location
- Bacon County, Georgia
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- Application Review in Progress
- Queue status
- Active
- Entered queue
- 28 September 2023
- Proposed online date
- November 2028
Location
Marker shows the centre of Bacon County; the queue data does not give exact sites.
Other requests in Bacon County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem