United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

SOLAR Β· SOUTHEAST

SR Bacon

SR Bacon is a 85.0 MW solar request under construction in the Southeast interconnection queue, in Bacon County, Georgia, connecting to Georgia Transmission.

Queue statusUnder construction
  1. PlanningQueued Aug 2020 (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingMar 2023 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
GI-143
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Offerman-Douglas 230 kV TL
Location
Bacon County, Georgia
Technology
Solar: 85.0 MW
Total requested
85.0 MW
Study phase
Full NTP
Queue status
Active
Entered queue
26 August 2020
Proposed online date
November 2026
Came online
March 2023

Location

Marker shows the centre of Bacon County; the queue data does not give exact sites.

Power plants in Georgia Β· Transmission lines in Georgia

Other requests in Bacon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem