United States βΊ Grid βΊ Interconnection queues βΊ Georgia
SOLAR Β· SOUTHEASTSR Bacon
SR Bacon is a 85.0 MW solar request under construction in the Southeast interconnection queue, in Bacon County, Georgia, connecting to Georgia Transmission.
Queue statusUnder construction
- PlanningQueued Aug 2020 (completed)
- Consented (completed)
- Construction (current stage)
- OperatingMar 2023 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- GI-143
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Offerman-Douglas 230 kV TL
- Location
- Bacon County, Georgia
- Technology
- Solar: 85.0 MW
- Total requested
- 85.0 MW
- Study phase
- Full NTP
- Queue status
- Active
- Entered queue
- 26 August 2020
- Proposed online date
- November 2026
- Came online
- March 2023
Location
Marker shows the centre of Bacon County; the queue data does not give exact sites.