United States › Grid › Interconnection queues › Georgia

SOLAR · SOUTHEAST

Hammond Solar

Hammond Solar is a 225 MW solar request in interconnection study in the Southeast interconnection queue, in Floyd County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Sep 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Nov 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-181
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Hammond - Anniston 230 kV TL
Location
Floyd County, Georgia
Technology
Solar: 225 MW
Total requested
225 MW
Study phase
System Impact Study
Queue status
Active
Entered queue
19 September 2023
Proposed online date
November 2025

Location

Marker shows the centre of Floyd County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Floyd County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem