πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

BATTERY STORAGE Β· SOUTHEAST

Battery storage project 25-IC-AP, Floyd County

Battery storage project 25-IC-AP, Floyd County is a 140 MW battery storage request withdrawn in the Southeast interconnection queue, in Floyd County, Georgia, connecting to Southern Company.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25-IC-AP
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Southern Company
Connection point (POI)
Silver Creek - Aragon 115 kV Line
Location
Floyd County, Georgia
Technology
Battery: 140 MW
Total requested
140 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Withdrawn
April 2025

Location

Marker shows the centre of Floyd County; the queue data does not give exact sites.

Power plants in Georgia Β· Transmission lines in Georgia

Other requests in Floyd County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem