OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Connecticut (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown92,905 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn92,905 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore Wind Increase
Offshore wind
1,200 MWWithdrawn / abandoned CTISO-NE Sep 2020target 2027
Offshore Wind
Offshore wind
1,200 MWWithdrawn / abandoned CTISO-NE Sep 2020target 2027
Battery Storage
Battery storage
200 MWWithdrawn / abandoned New Haven, CTISO-NE Apr 2020target 2026
Solar
Solar
135 MWWithdrawn / abandoned Hartford, CTISO-NE Sep 2020target 2022
Battery Storage
Battery storage
100 MWWithdrawn / abandoned Fairfield, CTISO-NE Sep 2020target 2023
Battery Storage
Battery storage
50.0 MWWithdrawn / abandoned New Haven, CTISO-NE Aug 2020target 2022
Fuel Cell
Gas
9.7 MWWithdrawn / abandoned Fairfield, CTISO-NE Jan 2020target 2024
Solar
Solar
6.0 MWWithdrawn / abandoned Tolland, CTISO-NE Jun 2020target 2024
Wind
Onshore wind
3.8 MWWithdrawn / abandoned Litchfield, CTISO-NE Mar 2020target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)