Fuel Cell is a 9.7 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut, connecting to UI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2020 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
949
Grid region
ISO-NE (New England)
Utility / transmission owner
UI
Connection point (POI)
UI 13.8kV Congress I Substation
Location
Fairfield County, Connecticut
Technology
Gas: 9.7 MW
Total requested
9.7 MW
Queue status
Withdrawn
Entered queue
23 January 2020
Proposed online date
December 2024
Withdrawn
June 2025

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem