United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
SOLAR Β· ISO-NESolar
Solar is a 135 MW solar request withdrawn in the ISO-NE interconnection queue, in Hartford County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedJul 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1061
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- The project will connect at North East Simsbury Substation (115 kV), with an alternate POI at the North East Simsbury to North Bloomfield 115 kV line in close proximity to the N.E. Simsbury substation
- Location
- Hartford County, Connecticut
- Technology
- Solar: 135 MW
- Total requested
- 135 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2020
- Proposed online date
- October 2022
- Withdrawn
- July 2021
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Hartford County
- SolarSolar Β· 150 MW Β· agreement signed
- Broadleaf SolarSolar Β· 101 MW Β· agreement signed
- SolarSolar Β· 25.0 MW Β· in study
- Solar IncreaseSolar Β· 5.0 MW Β· in study
- Gravel Pit SolarSolar Β· 50.0 MW Β· built
- Algonquin Power Windsor Locks Cogeneration FacilitGas Β· 47.5 MW Β· built
- Gravel Pit Solar IncreaseSolar Β· 45.0 MW Β· built
- SolarSolar Β· 26.4 MW Β· built
- Gravel Pit Solar increaseSolar Β· 25.0 MW Β· built
- NB Fuel CellGas Β· 20.2 MW Β· built
- Nutmeg Solar, LLCSolar Β· 19.9 MW Β· built
- Hamilton SundstrandGas Β· 5.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem