Withdrawn queue requests in Connecticut (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown192,758 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn192,758 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

19 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore Wind
Offshore wind
805 MWWithdrawn / abandoned CTISO-NE Oct 2018target 2023
Offshore Wind
Offshore wind
805 MWWithdrawn / abandoned CTISO-NE Oct 2018target 2023
NTE Connecticut
Gas
672 MWWithdrawn / abandoned Windham, CTISO-NE Mar 2018target 2025
Battery Storage
Battery storage
200 MWWithdrawn / abandoned Windham, CTISO-NE Dec 2018target 2024
Solar
Solar
50.0 MWWithdrawn / abandoned Hartford, CTISO-NE Oct 2018target 2022
Solar
Solar
26.4 MWWithdrawn / abandoned Hartford, CTISO-NE Feb 2018target 2020
Solar
Solar
24.6 MWWithdrawn / abandoned Hartford, CTISO-NE Feb 2018target 2020
Solar
Solar
20.0 MWWithdrawn / abandoned Windham, CTISO-NE Feb 2018target 2023
Solar
Solar
20.0 MWWithdrawn / abandoned Litchfield, CTISO-NE Feb 2018target 2024
Solar
Solar
20.0 MWWithdrawn / abandoned Windham, CTISO-NE Feb 2018target 2025
Battery Storage
Battery storage
20.0 MWWithdrawn / abandoned Hartford, CTISO-NE Feb 2018target 2022
Solar
Solar
19.9 MWWithdrawn / abandoned Hartford, CTISO-NE Feb 2018target 2021
Black Hill Point Energy Center
Solar
19.9 MWWithdrawn / abandoned Windham, CTISO-NE Sep 2018target 2025
Solar
Solar
19.9 MWWithdrawn / abandoned New London, CTISO-NE Sep 2018target 2023
Fuel Cell
Other
14.8 MWWithdrawn / abandoned Hartford, CTISO-NE Feb 2018target 2021
Solar
Solar
7.5 MWWithdrawn / abandoned Windham, CTISO-NE Feb 2018target 2019
Solar
Solar
6.0 MWWithdrawn / abandoned New London, CTISO-NE Feb 2018target 2019
Solar
Solar
5.0 MWWithdrawn / abandoned Windham, CTISO-NE Dec 2018target 2020
Generator Increase
Other
2.1 MWWithdrawn / abandoned Hartford, CTISO-NE Dec 2018target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)