United States › Grid › Interconnection queues › Connecticut

SOLAR · ISO-NE

Black Hill Point Energy Center

Black Hill Point Energy Center is a 19.9 MW solar request withdrawn in the ISO-NE interconnection queue, in Windham County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2018 (completed)
  2. Withdrawn / abandonedNov 2024 (project stopped here)
  3. ConsentedApr 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
787
Grid region
ISO-NE (New England)
Connection point (POI)
New 3 breaker ring bus switching station on Eversource (CL&P) Killingly to Tunnel 115 kV line L-1607.
Location
Windham County, Connecticut
Technology
Solar: 19.9 MW
Total requested
19.9 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
26 September 2018
Agreement signed
12 April 2022
Proposed online date
September 2025
Withdrawn
November 2024

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Windham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem