United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
SOLAR Β· ISO-NESolar
Solar is a 19.9 MW solar request withdrawn in the ISO-NE interconnection queue, in New London County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedSep 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 788
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Primary POI - Eversource Montville Plant 69 kV switchyard via new breaker position. Alternate POI - New 34.5 kV breaker position at Mohegan Tribal Utility Authority (MTUA) Fort Hill Substation.
- Location
- New London County, Connecticut
- Technology
- Solar: 19.9 MW
- Total requested
- 19.9 MW
- Service type
- Energy only (ERIS)
- Study phase
- In Progress
- Queue status
- Withdrawn
- Entered queue
- 28 September 2018
- Proposed online date
- December 2023
- Withdrawn
- September 2022
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in New London County
- Millstone 2 Upgrade7Nuclear Β· 906 MW Β· built
- Increase Existing CapacityNuclear Β· 70.0 MW Β· built
- Millstone IncreaseNuclear Β· 37.0 MW Β· built
- Fusion Solar CenterSolar Β· 20.0 MW Β· built
- SolarSolar Β· 17.7 MW Β· built
- SolarSolar Β· 15.0 MW Β· built
- Rand-Whitney Co-GenGas Β· 14.9 MW Β· built
- Foxwoods Central PlantGas Β· 13.2 MW Β· built
- Bloom Energy Fuel CellOther Β· 10.2 MW Β· built
- SolarSolar Β· 10.0 MW Β· built
- Battery StorageBattery storage Β· 300 MW Β· withdrawn
- Battery StorageBattery storage Β· 289 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem