πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί California

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in California (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown204,783 MW
Active in queue4,783 MW20 requests
Agreement signed4,721 MW18 requests
Withdrawn7120.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

20 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Descendant Ranch 1
Solar + storage
1,024 MWAgreement signed Colusa, CACAISO Apr 2018target 2034
Bellefield Solar Farm
Solar + storage
1,000 MWAgreement signed Kern, CACAISO Apr 2018target 2025
Sanborn Solar 2
Solar + storage
707 MWAgreement signed Kern, CACAISO Apr 2018target 2025
Key Storage 1
Battery storage
309 MWAgreement signed Fresno, CACAISO Apr 2018target 2026
Las Camas 3
Solar + storage
203 MWAgreement signed Merced, CACAISO Apr 2018target 2027
Kettle Solar One
Solar + storage
180 MWAgreement signed San Diego, CACAISO Apr 2018target 2026
Janus
Solar + storage
164 MWAgreement signed Colusa, CACAISO Apr 2018target 2026
Saloon Energy Storage
Battery storage
150 MWAgreement signed Colusa, CACAISO Apr 2018target 2027
Jasmine
Solar + storage
141 MWAgreement signed Kern, CACAISO Apr 2018target 2026
Baldy Mesa 2
Solar + storage
125 MWAgreement signed San Bernardino, CACAISO Apr 2018target 2026
Ajo Power Bank
Battery storage
124 MWAgreement signed Santa Clara, CACAISO Apr 2018target 2028
Reclaimed Wind
Battery storage
114 MWAgreement signed Alameda, CACAISO Apr 2018target 2026
Azalea
Solar + storage
99.3 MWAgreement signed Kern, CACAISO Apr 2018target 2025
Solano 4 Wind
Onshore wind
92.4 MWAgreement signed Solano, CACAISO Apr 2018target 2025
Chalan Solar
Solar + storage
91.8 MWAgreement signed Kern, CACAISO Apr 2018target 2026
Hummingbird Energy Storage
Battery storage
75.0 MWAgreement signed Santa Clara, CACAISO Apr 2018target 2025
Mulqueeney Ranch Wind 2
Onshore wind
62.5 MWAgreement signed Alameda, CACAISO Apr 2018target 2026
Angela
Solar + storage
60.0 MWAgreement signed Tulare, CACAISO Apr 2018target 2025
Prospect Energy Storage
Battery storage
58.8 MWPaused / redesign Sacramento, CACAISO Apr 2018target 2028
Milpa Power Bank
Battery storage
3.0 MWIn study Santa Clara, CACAISO Apr 2018target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)