Withdrawn queue requests in California (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8811.3 GW
Active in queue3,789 MW15 requests
Agreement signed3,789 MW15 requests
Withdrawn8811.3 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

88 requests ยท page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Eagle Mountain Pump Storage #4
Battery storage
1,408 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2022
Morro Bay Wave Energy Project
Other
650 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2015target 2020
Irish
Gas
600 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2020
Rainbow Energy Center
Gas
523 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2018
Midtown Canyon Gas
Gas
507 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Frazier Es
Battery storage
420 MWWithdrawn / abandoned Tulare, CACAISO Apr 2015target 2021
Brisbane Es
Battery storage
412 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2015target 2021
Bradmore BESS Fka Bradmore Es
Battery storage
412 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2015target 2021
Palo Verde Energy Storage
Battery storage
400 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2020
Royal (Fka Wheeler Indigo)
Solar + storage
360 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2019
Beltran Solar
Solar
300 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2015target 2018
Fresno Solar 1
Solar
247 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2018
Algoso Es
Battery storage
206 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2021
Mikado
Solar + storage
206 MWWithdrawn / abandoned Imperial, CACAISO Apr 2015target 2018
Mount Vernon Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
Ancho Creek Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Otay Mesa BESS
Battery storage
200 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2018
Pistachio Energy Park
Solar + storage
191 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
High Desert View Solar
Solar + storage
168 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2019
Oakland Es
Battery storage
156 MWWithdrawn / abandoned Alameda, CACAISO Apr 2015target 2021
Periwinkle
Solar + storage
155 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Alamo Springs Solar 1
Solar + storage
154 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2023
Tampadero Solar
Solar
150 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2021
Harper Lake Energy Storage
Battery storage
140 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2021
Sienna
Solar + storage
133 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2018
Palmdale Energy
Gas
130 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2015target 2022
American Kings 2
Solar
120 MWWithdrawn / abandoned Kings, CACAISO Apr 2015target 2020
Harvest Energy Storage Project (Fka Otay Mesa MSS)
Battery storage
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Pio Pico Unit 4
Gas
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2018
Sidewinder Solar
Solar
109 MWWithdrawn / abandoned Riverside, CACAISO Apr 2015target 2019
Bridgehead Es
Battery storage
103 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2015target 2021
Golden Fields Solar 3
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Midtown Canyon Es
Battery storage
100 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Kimberlina Solar
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
White Wolf Solar
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
Alamo Springs Solar 2
Solar + storage
96.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2023
Bonsall Renewable
Solar + storage
84.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2017
Heirloom Renewable
Solar + storage
84.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2017
Dos Amigos Solar
Solar
81.8 MWWithdrawn / abandoned Merced, CACAISO Apr 2015target 2020
Basket Ridge Solar
Solar
80.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Nicolaus Storage
Battery storage
64.0 MWWithdrawn / abandoned Sutter, CACAISO Apr 2015target 2020
Jacumba Ranch
Solar + storage
60.3 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2021
Central Valley
Solar
60.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2021
Sand Hill Wind 2
Onshore wind
52.5 MWWithdrawn / abandoned Alameda, CACAISO Apr 2015target 2017
Gale Solar 1
Solar
50.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2018
Westlands Artichoke
Solar
50.0 MWWithdrawn / abandoned Kings, CACAISO Apr 2015target 2021
Oveja Solar Farm
Solar
50.0 MWWithdrawn / abandoned Merced, CACAISO Apr 2015target 2020
Firebaugh Panoche BESS (Fka Panoche Energy Reliability Center)
Battery storage
50.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2018
Ordway Energy Storage (Fka Oceanside BESS)
Battery storage
50.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
White Rock Solar Farm
Solar
50.0 MWWithdrawn / abandoned Merced, CACAISO Apr 2015target 2020
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)