OCTARY USA ยท INTERCONNECTION QUEUES

Withdrawn queue requests in Arkansas (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7415.6 GW
Active in queue4,281 MW16 requests
Agreement signed72.5 MW1 requests
Withdrawn7415.6 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

74 requests ยท page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J3530, Saline County
Solar
500 MWWithdrawn / abandoned Saline, ARMISO Apr 2024target 2028
Solar project J3626, Craighead County
Solar
500 MWWithdrawn / abandoned Craighead, ARMISO Apr 2024target 2027
Solar project J3426, Chicot County
Solar
500 MWWithdrawn / abandoned Chicot, ARMISO Mar 2024target 2028
Solar project J3386, Calhoun County
Solar
500 MWWithdrawn / abandoned Calhoun, ARMISO Apr 2024target 2028
Solar project J3427, Mississippi County
Solar
500 MWWithdrawn / abandoned Mississippi, ARMISO Mar 2024target 2028
Solar project J3303, Prairie County
Solar
400 MWWithdrawn / abandoned Prairie, ARMISO Apr 2024target 2027
Solar project J3388, Calhoun County
Solar
400 MWWithdrawn / abandoned Calhoun, ARMISO Apr 2024target 2028
Solar project J3540, Monroe County
Solar
400 MWWithdrawn / abandoned Monroe, ARMISO Apr 2024target 2028
Solar project J3711, Calhoun County
Solar
400 MWWithdrawn / abandoned Calhoun, ARMISO Apr 2024target 2029
Solar project J3304, Clark County
Solar
350 MWWithdrawn / abandoned Clark, ARMISO Apr 2024target 2027
Solar project J3570, Cross County
Solar
300 MWWithdrawn / abandoned Cross, ARMISO Apr 2024target 2028
Solar project J3575, Mississippi County
Solar
300 MWWithdrawn / abandoned Mississippi, ARMISO Apr 2024target 2028
Solar + storage project J3583, Lonoke County
Solar + storage
300 MWWithdrawn / abandoned Lonoke, ARMISO Apr 2024target 2028
Solar project J3802, Phillips County
Solar
300 MWWithdrawn / abandoned Phillips, ARMISO Apr 2024target 2028
Solar project J3569, Poinsett County
Solar
300 MWWithdrawn / abandoned Poinsett, ARMISO Apr 2024target 2028
Solar + storage project J3747, Lonoke County
Solar + storage
300 MWWithdrawn / abandoned Lonoke, ARMISO Apr 2024target 2028
Solar project J3773, Drew County
Solar
265 MWWithdrawn / abandoned Drew, ARMISO Apr 2024target 2028
Solar project J3571, Poinsett County
Solar
250 MWWithdrawn / abandoned Poinsett, ARMISO Apr 2024target 2028
Solar project J3270, Phillips County
Solar
250 MWWithdrawn / abandoned Phillips, ARMISO Apr 2024target 2028
Solar project J3511, Arkansas County
Solar
250 MWWithdrawn / abandoned Arkansas, ARMISO Apr 2024target 2028
Battery storage project J3580, Mississippi County
Battery storage
250 MWWithdrawn / abandoned Mississippi, ARMISO Apr 2024target 2028
Solar project J3271, Mississippi County
Solar
230 MWWithdrawn / abandoned Mississippi, ARMISO Apr 2024target 2028
Battery storage project J3584, Lee County
Battery storage
215 MWWithdrawn / abandoned Lee, ARMISO Apr 2024target 2028
Solar project J3435, Arkansas County
Solar
210 MWWithdrawn / abandoned Arkansas, ARMISO Apr 2024target 2028
Solar project J3627, Craighead County
Solar
200 MWWithdrawn / abandoned Craighead, ARMISO Apr 2024target 2027
Solar project J3300, Craighead County
Solar
200 MWWithdrawn / abandoned Craighead, ARMISO Apr 2024target 2027
Solar project J3783, Cross County
Solar
200 MWWithdrawn / abandoned Cross, ARMISO Apr 2024target 2028
Battery storage project J3567, Calhoun County
Battery storage
200 MWWithdrawn / abandoned Calhoun, ARMISO Apr 2024target 2026
Solar project J3484, Union County
Solar
200 MWWithdrawn / abandoned Union, ARMISO Apr 2024target 2027
Solar project J3423, Jackson County
Solar
200 MWWithdrawn / abandoned Jackson, ARMISO May 2024target 2028
Solar project J3373, Poinsett County
Solar
200 MWWithdrawn / abandoned Poinsett, ARMISO Apr 2024target 2028
Solar project J3459, Craighead County
Solar
200 MWWithdrawn / abandoned Craighead, ARMISO Apr 2024target 2028
Solar + storage project J3606, Cross County
Solar + storage
198 MWWithdrawn / abandoned Cross, ARMISO Apr 2024target 2028
Solar + storage project J3536, Poinsett County
Solar + storage
190 MWWithdrawn / abandoned Poinsett, ARMISO Apr 2024target 2028
Solar project J3308, Woodruff County
Solar
180 MWWithdrawn / abandoned Woodruff, ARMISO Apr 2024target 2027
Battery storage project J3614, Ashley County
Battery storage
180 MWWithdrawn / abandoned Ashley, ARMISO Apr 2024target 2028
Solar project J3301, Prairie County
Solar
180 MWWithdrawn / abandoned Prairie, ARMISO Apr 2024target 2027
Solar project J3613, Ashley County
Solar
180 MWWithdrawn / abandoned Ashley, ARMISO Apr 2024target 2028
Solar + storage project J3510, Cross County
Solar + storage
175 MWWithdrawn / abandoned Cross, ARMISO Apr 2024target 2028
Solar + storage project J3458, Cross County
Solar + storage
170 MWWithdrawn / abandoned Cross, ARMISO Apr 2024target 2028
Solar + storage project J3775, Desha County
Solar + storage
160 MWWithdrawn / abandoned Desha, ARMISO Apr 2024target 2028
Solar + storage project J3812, Phillips County
Solar + storage
159 MWWithdrawn / abandoned Phillips, ARMISO Apr 2024target 2028
Solar project J3624, Columbia County
Solar
155 MWWithdrawn / abandoned Columbia, ARMISO Apr 2024target 2028
Solar project J3380, Cleveland County
Solar
155 MWWithdrawn / abandoned Cleveland, ARMISO Apr 2024target 2028
Solar project J3741, Cleveland County
Solar
155 MWWithdrawn / abandoned Cleveland, ARMISO Apr 2024target 2028
Solar project J3621, Craighead County
Solar
150 MWWithdrawn / abandoned Craighead, ARMISO Apr 2024target 2028
Onshore wind project J3706, Mississippi County
Onshore wind
150 MWWithdrawn / abandoned Mississippi, ARMISO Apr 2024target 2030
Battery storage project J3620, Mississippi County
Battery storage
150 MWWithdrawn / abandoned Mississippi, ARMISO Apr 2024target 2028
Solar project J3263, Desha County
Solar
150 MWWithdrawn / abandoned Desha, ARMISO Apr 2024target 2028
Solar + storage project J3658, Clark County
Solar + storage
150 MWWithdrawn / abandoned Clark, ARMISO Mar 2024target 2028
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)