United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J3426, Chicot County
Solar project J3426, Chicot County is a 500 MW solar request withdrawn in the MISO interconnection queue, in Chicot County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2024 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3426
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- MACON LAKE SS
- Location
- Chicot County, Arkansas
- Technology
- Solar: 500 MW
- Total requested
- 500 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 19 March 2024
- Proposed online date
- September 2028
- Withdrawn
- July 2025
Location
Marker shows the centre of Chicot County; the queue data does not give exact sites.
Other requests in Chicot County
- Solar project J2143, Chicot CountySolar Β· 250 MW Β· in study
- Solar project J2985, Chicot CountySolar Β· 135 MW Β· in study
- Solar project J620, Chicot CountySolar Β· 100 MW Β· built
- Solar project J2850, Chicot CountySolar Β· 250 MW Β· withdrawn
- Solar project J2451, Chicot CountySolar Β· 200 MW Β· withdrawn
- Solar project J698, Chicot CountySolar Β· 150 MW Β· withdrawn
- Solar project J922, Chicot CountySolar Β· 100 MW Β· withdrawn
- Solar project J2941, Chicot CountySolar Β· 100 MW Β· withdrawn
- Solar project J2644, Chicot CountySolar Β· 90.0 MW Β· withdrawn
- Battery storage project J2995, Chicot CountyBattery storage Β· 80.0 MW Β· withdrawn
- Solar project J350, Chicot CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem