SOLAR Β· MISOSolar project J3711, Calhoun County
Solar project J3711, Calhoun County is a 400 MW solar request withdrawn in the MISO interconnection queue, in Calhoun County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3711
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- SHERIDAN EHV - EL DORADO EHV 500.0kV
- Location
- Calhoun County, Arkansas
- Technology
- Solar: 400 MW
- Total requested
- 400 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 16 April 2024
- Proposed online date
- November 2029
- Withdrawn
- December 2025
Location
Marker shows the centre of Calhoun County; the queue data does not give exact sites.
Other requests in Calhoun County
- Solar project J2395, Calhoun CountySolar Β· 500 MW Β· in study
- Solar project J2396, Calhoun CountySolar Β· 400 MW Β· in study
- Solar + storage project J2397, Calhoun CountySolar + storage Β· 160 MW Β· in study
- Solar project J2785, Calhoun CountySolar Β· 500 MW Β· withdrawn
- Solar project J3386, Calhoun CountySolar Β· 500 MW Β· withdrawn
- Solar project J3388, Calhoun CountySolar Β· 400 MW Β· withdrawn
- Solar project J2640, Calhoun CountySolar Β· 395 MW Β· withdrawn
- Battery storage project J3567, Calhoun CountyBattery storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem