United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J3627, Craighead County
Solar project J3627, Craighead County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Craighead County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3627
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- JONESBORO (APL) - CASH 161.0kV
- Location
- Craighead County, Arkansas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 18 April 2024
- Proposed online date
- December 2027
- Withdrawn
- December 2025
Location
Marker shows the centre of Craighead County; the queue data does not give exact sites.
Other requests in Craighead County
- Solar project J2478, Craighead CountySolar Β· 550 MW Β· in study
- Solar + storage project J2764, Craighead CountySolar + storage Β· 150 MW Β· in study
- Solar project GEN-2023-132, Craighead CountySolar Β· 150 MW Β· in study
- Solar + storage project J3111, Craighead CountySolar + storage Β· 100 MW Β· in study
- Solar project J2399, Craighead CountySolar Β· 500 MW Β· withdrawn
- Solar project J3626, Craighead CountySolar Β· 500 MW Β· withdrawn
- Solar + storage project J3110, Craighead CountySolar + storage Β· 400 MW Β· withdrawn
- Solar project J3300, Craighead CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project J2394, Craighead CountySolar + storage Β· 200 MW Β· withdrawn
- Solar + storage project J2356, Craighead CountySolar + storage Β· 200 MW Β· withdrawn
- Solar project J3459, Craighead CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project J2398, Craighead CountySolar + storage Β· 160 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem