Queue requests in study in Southeast (non-ISO utilities) (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown121,469 MW
Active in queue6,006 MW37 requests
Agreement signed3,957 MW18 requests
Withdrawn19937.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Thundering Springs
Solar + storage
240 MWIn study Laurens, GASoutheast Nov 20192023
Union City Storage I
Battery storage
200 MWIn study Fulton, GASoutheast Dec 20192022
Bear Bin Solar
Solar
150 MWIn study Terrell, GASoutheast Oct 20192023
Limestone Solar
Solar + storage
150 MWIn study Macon, GASoutheast May 20192021
Dawson Solar
Solar
150 MWIn study Terrell, GASoutheast Sep 20192022
Union City Storage II
Battery storage
100 MWIn study Fulton, GASoutheast Dec 20192022
All Star Solar
Solar
95.0 MWIn study Appling, GASoutheast Oct 20192023
Solar project IC-832, Monroe County
Solar
80.0 MWPaused / redesign Monroe, ALSoutheast Oct 2019target 2026
Solar project IC-831, Washington County
Solar
80.0 MWPaused / redesign Washington, ALSoutheast Oct 2019target 2026
Solar project 132, Hampton County
Solar
75.0 MWIn study Hampton, SCSoutheast Dec 2019target 2024
Solar project 269, Marion County
Solar Β· Solar FL 2018 LLC
74.9 MWIn study Marion, FLSoutheast Sep 2019target 2021
Solar project 376, Baker County
Solar Β· FPL
74.5 MWIn study Baker, FLSoutheast Nov 2019target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)