United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 376, Baker County
Solar project 376, Baker County is a 74.5 MW solar request in interconnection study in the Southeast interconnection queue, in Baker County, Florida, connecting to Florida Power & Light.
Queue statusIn planning
- PlanningQueued Nov 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 376
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Duval-Raven 230kV
- Location
- Baker County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Facility Study
- Queue status
- Active
- Entered queue
- 22 November 2019
- Proposed online date
- July 2027
Location
Marker shows the centre of Baker County; the queue data does not give exact sites.
Other requests in Baker County
- Solar project 344, Baker CountySolar · 74.5 MW · in study
- Solar project 375, Baker CountySolar · 74.5 MW · built
- Solar project 300, Baker CountySolar · 74.5 MW · built
- Solar project 200Solar · 74.5 MW · built
- Solar project 374, Baker CountySolar · 74.5 MW · built
- Solar project 212, Baker CountySolar · 60.0 MW · withdrawn
- Solar project 421, Baker CountySolar · 14.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem