United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 269, Marion County
Solar project 269, Marion County is a 74.9 MW solar request in interconnection study in the Southeast interconnection queue, in Marion County, Florida, connecting to Duke Energy Florida.
Queue statusIn planning
- PlanningQueued Sep 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2021 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 269
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Solar FL 2018 LLC
- Connection point (POI)
- Dunnellon Town Substation
- Location
- Marion County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Facility Study
- Queue status
- Active
- Entered queue
- 30 September 2019
- Proposed online date
- December 2021
Location
Marker shows the centre of Marion County; the queue data does not give exact sites.
Other requests in Marion County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem