United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in ISO-NE (New England)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind Offshore wind |
827 MW | In study |
| Battery Storage Battery storage |
500 MW | In study |
| Battery Storage Battery storage |
500 MW | In study |
| Offshore Wind Inc. (Q806) Offshore wind |
487 MW | In study |
| Battery Storage Battery storage |
350 MW | In study |
| Willard Storage (NYISO-C24-148) Battery storage |
300 MW | In study |
| Battery Storage Battery storage |
300 MW | In study |
| Battery Storage Battery storage |
300 MW | In study |
| Battery Storage Battery storage |
290 MW | In study |
| Battery Storage Battery storage |
250 MW | In study |
| Battery Storage Battery storage |
225 MW | In study |
| Battery Storage Battery storage |
200 MW | In study |
| Battery Storage Battery storage |
180 MW | In study |
| Solar Solar |
180 MW | In study |
| Battery Storage Battery storage |
170 MW | In study |
| Battery Storage Battery storage |
170 MW | In study |
| Battery Storage Battery storage |
168 MW | In study |
| NY Chateaugay 0 Willis Rd Storage (NYISO-C24-304-004) Battery storage |
150 MW | In study |
| Battery Storage Battery storage |
136 MW | In study |
| Battery Storage Battery storage |
125 MW | In study |
| Solar Solar |
100 MW | In study |
| Solar Solar |
25.0 MW | In study |
| Solar Solar |
20.0 MW | In study |
| Battery Storage Battery storage |
19.3 MW | In study |
| Battery Storage Battery storage |
19.3 MW | In study |
| Offshore wind Inc (QP700) Offshore wind |
18.0 MW | In study |
| Solar Increase Solar |
5.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 Β· 455.6 GW
- ERCOT (Texas)1,408 Β· 328.0 GW
- MISO (Midcontinent)1,337 Β· 302.2 GW
- Southeast (non-ISO utilities)815 Β· 118.5 GW
- SPP (Southwest Power Pool)480 Β· 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 Β· 105.4 GW
- CAISO (California)194 Β· 92.4 GW
- NYISO (New York)190 Β· 27.1 GW
- ISO-NE (New England)27 Β· 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)