United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in ERCOT (Texas) (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Wolf Hollow 2 Gas Β· Exelon |
1,118 MW | |
| Santacru Onshore wind Β· Enbridge |
250 MW | |
| Electra Wind Onshore wind Β· Starwood Energy |
230 MW | |
| RE Maplewood 2a Solar Solar Β· Recurrent Energy |
222 MW | |
| Flat Top Wind I Onshore wind Β· Alterra Power |
200 MW | |
| Lockett Wind Onshore wind Β· Lincoln Clean |
184 MW | |
| CASL_GAP (Castle Gap Solar) Solar Β· Vistra Energy/Luminant |
180 MW | |
| Falvez Astra W Onshore wind Β· Falvez Energy |
163 MW | |
| RE Roserock Solar Solar Β· Recurrent Energy |
160 MW | |
| SPTX12B (CED Upton Solar) Solar Β· ConEd Development |
158 MW | |
| Old Settler Wind Onshore wind Β· Apex Clean |
150 MW | |
| Tyler Bluff Wind Onshore wind Β· Southern Power Company |
126 MW | |
| East Pecos Solar Solar Β· First Solar |
120 MW | |
| Solara Solar Solar Β· ConEd Development |
106 MW | |
| LMESASLR (BNB Lamesa Solar 1) Solar Β· BNB Lamesa Solar LLC |
102 MW | |
| Sky Global Power One Gas Β· Sky Global Power |
51.4 MW | |
| Lasso Solar Β· Solaire Direct |
50.0 MW | |
| Lamesa Solar B (Phase II) IVORY Solar Β· OCI Solar |
50.0 MW | |
| Cotton Plains Wind Onshore wind Β· Apex Clean |
50.0 MW | |
| RE Maplewood 2b Solar Solar Β· Recurrent Energy |
28.0 MW | |
| TPC Power Gas Β· Walters Power |
9.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)60 Β· 8,237 MW
- MISO (Midcontinent)34 Β· 6,748 MW
- ERCOT (Texas)21 Β· 3,706 MW
- West (non-ISO utilities)65 Β· 2,635 MW
- NYISO (New York)10 Β· 2,535 MW
- Southeast (non-ISO utilities)10 Β· 2,526 MW
- SPP (Southwest Power Pool)18 Β· 2,031 MW
- ISO-NE (New England)11 Β· 1,849 MW
- CAISO (California)10 Β· 735 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)