Lasso is a 50.0 MW solar request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 15INR0061
- Grid region
- ERCOT (Texas)
- Developer
- Solaire Direct
- Connection point (POI)
- 6674 Bronco 69kV
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 17 January 2014
- Agreement signed
- 10 November 2015
- Proposed online date
- June 2018
- Came online
- May 2018