United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTCASL_GAP (Castle Gap Solar)
CASL_GAP (Castle Gap Solar) is a 180 MW solar request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 16INR0065
- Grid region
- ERCOT (Texas)
- Developer
- Vistra Energy/Luminant
- Connection point (POI)
- 132781 Castle Gap 34.5kV
- Technology
- Solar: 180 MW
- Total requested
- 180 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 19 September 2014
- Agreement signed
- 4 September 2015
- Proposed online date
- June 2018
- Came online
- May 2018
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem