United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTSPTX12B (CED Upton Solar)
SPTX12B (CED Upton Solar) is a 158 MW solar request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 16INR0065b
- Grid region
- ERCOT (Texas)
- Developer
- ConEd Development
- Connection point (POI)
- 132941 SPTX12B 34.5kV
- Technology
- Solar: 158 MW
- Total requested
- 158 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 19 September 2014
- Agreement signed
- 29 October 2015
- Proposed online date
- September 2017
- Came online
- August 2017
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem