πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Arizona, CAISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1616.5 GW
Active in queue23.0 GW22 requests
Agreement signed6,499 MW6 requests
Withdrawn4931.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

16 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Jove Solar
Solar + storage
4,133 MWIn study La Paz, AZCAISO Apr 2021target 2030
Stanley
Solar + storage
2,071 MWIn study Maricopa, AZCAISO Apr 2023target 2030
Bouse Solar And Storage Plant
Solar + storage
2,021 MWIn study La Paz, AZCAISO Apr 2021target 2033
Ranegras PVS
Solar + storage
1,438 MWIn study La Paz, AZCAISO Apr 2021target 2029
Alisa Solar Energy Complex 2
Solar + storage
1,000 MWIn study Yuma, AZCAISO Apr 2023target 2030
Hoodini
Solar + storage
910 MWIn study Yuma, AZCAISO Apr 2019target 2028
Harquahala Flats 2
Solar + storage
822 MWIn study Maricopa, AZCAISO Apr 2021target 2028
Socorro Peak Solar
Solar + storage
756 MWIn study La Paz, AZCAISO Apr 2021target 2029
Harquahala Sunrise
Solar + storage
618 MWIn study Maricopa, AZCAISO Apr 2020target 2030
Remy
Solar + storage
617 MWIn study Yuma, AZCAISO Apr 2021target 2029
Domestic Chicken
Solar
559 MWIn study Maricopa, AZCAISO Apr 2023target 2029
Vulcan
Solar + storage
500 MWIn study Maricopa, AZCAISO Apr 2018target 2027
Alisa Solar Energy Complex
Solar + storage
417 MWIn study Yuma, AZCAISO Apr 2021target 2028
Harquahala Sunrise 2
Solar + storage
330 MWIn study Maricopa, AZCAISO Apr 2021target 2026
Mesquite Solar 6
Solar + storage
309 MWIn study Maricopa, AZCAISO Apr 2023target 2028
Agua Caliente Solar 2
Solar
20.0 MWIn study Maricopa, AZCAISO Mar 2016target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)