United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in West (non-ISO utilities) — page 96

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5,277949.5 GW
Active in queue519.1 GW1,857 requests
Agreement signed60.6 GW349 requests
Withdrawn5,277949.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5,277 requests · page 96 of 106
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project SGI-PNM-2021-55, Valencia County
Solar
3.9 MWWithdrawn / abandoned Valencia, NMWest Sep 2021target 2023
Solar project 1096, Box Elder County
Solar
3.9 MWWithdrawn / abandoned Box Elder, UTWest Dec 2018target 2019
Solar project TCS-24, Box Elder County
Solar
3.9 MWWithdrawn / abandoned Box Elder, UTWest Dec 2018target 2019
Solar project SGI-PNM-2022-11, Luna County
Solar
3.9 MWWithdrawn / abandoned Luna, NMWest Jan 2022target 2023
Wind + storage project 1216, Salt Lake County
Wind + storage
3.9 MWWithdrawn / abandoned Salt Lake, UTWest Apr 2020
Onshore wind project C3-091, Albany County
Onshore wind · PacifiCorp
3.6 MWWithdrawn / abandoned Albany, WYWest May 2023target 2024
Geothermal project C4-001, Beaver County
Geothermal
3.6 MWWithdrawn / abandoned Beaver, UTWest Apr 2024target 2025
Onshore wind project GI-0914, Lyon County
Onshore wind
3.6 MWWithdrawn / abandoned Lyon, MNWest May 2009target 2010
Hydro project 344, Fremont County
Hydro
3.6 MWWithdrawn / abandoned Fremont, IDWest Jun 2010target 2012
Other project Q27, Maricopa County
Other
3.6 MWWithdrawn / abandoned Maricopa, AZWest Nov 2006target 2009
Geothermal project 285, Gem County
Geothermal
3.5 MWWithdrawn / abandoned Gem, IDWest Mar 2009target 2010
Other project 236, Canyon County
Other
3.5 MWWithdrawn / abandoned Canyon, IDWest Apr 2008target 2009
Hydro project 450, Lewis And Clark County
Hydro
3.4 MWWithdrawn / abandoned Lewis And Clark, MTWest Oct 2023target 2025
Onshore wind project 318, Meagher County
Onshore wind
3.3 MWWithdrawn / abandoned Meagher, MTWest Jun 2017target 2018
Solar project 679, Iron County
Solar
3.3 MWWithdrawn / abandoned Iron, UTWest Jun 2015target 2016
Onshore wind project 319, Meagher County
Onshore wind
3.3 MWWithdrawn / abandoned Meagher, MTWest Jun 2017target 2018
Solar project 678, Iron County
Solar
3.3 MWWithdrawn / abandoned Iron, UTWest Jun 2015target 2016
Hydro project 345-B, Washington County
Hydro
3.3 MWWithdrawn / abandoned Washington, UTWest Jul 2010target 2010
Onshore wind project 320, Meagher County
Onshore wind
3.3 MWWithdrawn / abandoned Meagher, MTWest Jun 2017target 2018
Hydro project 368, Jerome County
Hydro
3.2 MWWithdrawn / abandoned Jerome, IDWest Feb 2011
Other project 291, Ada County
Other
3.2 MWWithdrawn / abandoned Ada, IDWest May 2009target 2012
Other project 168, Canyon County
Other
3.2 MWWithdrawn / abandoned Canyon, IDWest May 2006target 2006
Solar project 1002, Klamath County
Solar
3.2 MWWithdrawn / abandoned Klamath, ORWest Jan 2018target 2018
Other project 169, Jerome County
Other
3.2 MWWithdrawn / abandoned Jerome, IDWest May 2006target 2007
Other project 722, Salt Lake County
Other
3.2 MWWithdrawn / abandoned Salt Lake, UTWest Nov 2015target 2016
Hydro project 166, Baker County
Hydro
3.2 MWWithdrawn / abandoned Baker, ORWest Feb 2006
Other project 234, Minidoka County
Other
3.2 MWWithdrawn / abandoned Minidoka, IDWest Mar 2008
Solar project 1001, Klamath County
Solar
3.2 MWWithdrawn / abandoned Klamath, ORWest Jan 2018target 2018
Solar project 1058, Klamath County
Solar
3.0 MWWithdrawn / abandoned Klamath, ORWest Aug 2018target 2019
Solar project 228, Judith Basin County
Solar
3.0 MWWithdrawn / abandoned Judith Basin, MTWest Nov 2015target 2016
Solar project 242, Cascade County
Solar
3.0 MWWithdrawn / abandoned Cascade, MTWest Feb 2016target 2016
Solar project 240, Gallatin County
Solar
3.0 MWWithdrawn / abandoned Gallatin, MTWest Dec 2015target 2016
Solar project T2-068, Jackson County
Solar
3.0 MWWithdrawn / abandoned Jackson, ORWest Sep 2025target 2025
Solar project 255, Chouteau County
Solar
3.0 MWWithdrawn / abandoned Chouteau, MTWest Feb 2016target 2016
Solar project 1146, Box Elder County
Solar
3.0 MWWithdrawn / abandoned Box Elder, UTWest Jun 2019target 2021
Onshore wind project 48, Utah County
Onshore wind
3.0 MWWithdrawn / abandoned Utah, UTWest Nov 2004target 2005
Solar project 237, Judith Basin County
Solar
3.0 MWWithdrawn / abandoned Judith Basin, MTWest Dec 2015target 2016
Hydro project G0494, Malheur County
Hydro
3.0 MWWithdrawn / abandoned Malheur, ORWest Aug 2013target 2015
Solar project 248, Carbon County
Solar
3.0 MWWithdrawn / abandoned Carbon, MTWest Feb 2016target 2016
Solar project 1075, Klamath County
Solar
3.0 MWWithdrawn / abandoned Klamath, ORWest Oct 2018target 2019
Solar project 277, Chouteau County
Solar
3.0 MWWithdrawn / abandoned Chouteau, MTWest May 2016target 2017
Solar project 290, Cascade County
Solar
3.0 MWWithdrawn / abandoned Cascade, MTWest Jun 2016target 2017
Solar project 292, Silver Bow County
Solar
3.0 MWWithdrawn / abandoned Silver Bow, MTWest Jul 2016target 2020
Solar project 184, Missoula County
Solar
3.0 MWWithdrawn / abandoned Missoula, MTWest Feb 2015target 2016
Solar project 910, Jackson County
Solar
3.0 MWWithdrawn / abandoned Jackson, ORWest Jul 2017target 2019
Solar project 306, Gallatin County
Solar
3.0 MWWithdrawn / abandoned Gallatin, MTWest Nov 2016target 2020
Solar project 270, Pondera County
Solar
3.0 MWWithdrawn / abandoned Pondera, MTWest Mar 2016target 2017
Solar project 1157, Tremonton County
Solar
3.0 MWWithdrawn / abandoned Tremonton, UTWest Aug 2019target 2021
Solar project 724, Douglas County
Solar
3.0 MWWithdrawn / abandoned Douglas, ORWest Dec 2015target 2017
Solar project 297, Judith Basin County
Solar
3.0 MWWithdrawn / abandoned Judith Basin, MTWest Jul 2016target 2017
Page 96 of 106

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)