πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

WIND + STORAGE Β· WEST

Wind + storage project 1216, Salt Lake County

Wind + storage project 1216, Salt Lake County is a 3.9 MW wind + storage request withdrawn in the West interconnection queue, in Salt Lake County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1216
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Circuit RKW17 out of Porter Rockwell substation
Location
Salt Lake County, Utah
Technology
Wind: 3.9 MW Β· Battery
Total requested
3.9 MW
Service type
Energy only (ERIS)
Study phase
Request assumed to be submitted to 2021 cluster
Queue status
Withdrawn
Entered queue
14 April 2020

Location

Marker shows the centre of Salt Lake County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Salt Lake County