United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

SOLAR Β· WEST

Solar project 228, Judith Basin County

Solar project 228, Judith Basin County is a 3.0 MW solar request withdrawn in the West interconnection queue, in Judith Basin County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
228
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Moccasin Substation
Location
Judith Basin County, Montana
Technology
Solar: 3.0 MW
Total requested
3.0 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
23 November 2015
Proposed online date
November 2016

Location

Marker shows the centre of Judith Basin County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Judith Basin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem