United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

ONSHORE WIND Β· WEST

Onshore wind project 171, Judith Basin County

Onshore wind project 171, Judith Basin County is a 25.0 MW onshore wind request withdrawn in the West interconnection queue, in Judith Basin County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
171
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
NWE's Spion Kop 100kV Switchyard
Location
Judith Basin County, Montana
Technology
Wind: 25.0 MW
Total requested
25.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
14 July 2014
Proposed online date
December 2015

Location

Marker shows the centre of Judith Basin County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Judith Basin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem